Run a Sprint Retrospective to improve how the Scrum Team works. Run an incident postmortem to understand what happened in a specific incident and reduce the chance or impact of a repeat. Run both when an incident needs a closer look and its findings can help the team improve its day-to-day work. Do the investigation once.
| Sprint Retrospective | Incident postmortem | |
|---|---|---|
| Starting point | The Sprint as a whole | A specific incident and its impact |
| When | At the conclusion of every Sprint in Scrum | After the incident is under control, according to your incident policy |
| Who | The Scrum Team | People who can explain what happened or act on what you learn |
| Main question | How can we improve quality and effectiveness? | What conditions led to this incident, and how could we prevent or limit a repeat? |
| Useful result | An improvement to how the team works | An agreed record of the incident, contributing factors and follow-up actions |
The Scrum Guide defines the first event. The second is an operational practice, not a Scrum event. Google's SRE guidance recommends agreeing in advance which incidents trigger a postmortem. It also explains how to investigate the system without blaming people for acting on the information they had.
When to run both
Use your incident criteria first. If an event meets them, don't wait for the Sprint Retrospective to reconstruct what happened. The incident review can involve people outside the Scrum Team and examine evidence that doesn't belong in a general team discussion.
Then ask whether the postmortem found a pattern the Scrum Team can change. A technical fix may already have an owner. The retro can explore a different issue, such as how teams hand over releases or what happens when the first reviewer is unavailable. If there is no wider lesson for the team, link to the postmortem and use the retro time for other subjects.
Example: one failed release, two different changes
A delivery app deploys a change to its tracking page. Some users see stale delivery updates for 24 minutes. Support hears about the problem before the on-call engineer does.
In the incident postmortem, the responders compare deployment, alert and support timestamps. The request-success monitor stayed green, even though the page was returning old tracking data. The reliability engineer agrees to add a freshness alert and test that it pages the on-call team. That action belongs in the incident tracker.
In the Sprint Retrospective, the team brings one finding, not the whole timeline: before rollout, nobody had said how to tell if a successful response contained the wrong data. The team agrees to add one user-facing failure check to the next three release plans. At the following retro, it will look at which checks the team actually ran. That action belongs with the team's other improvement experiments.
The first change improves detection for this service. The second changes how the team prepares future releases.
Hand over the finding, not the meeting
Bring three lines to the retro: what the postmortem established, what already has an owner, and what question remains for the team. Link to the original action instead of writing it into a second tracker. If the postmortem is still in progress, label any assumptions and avoid treating them as conclusions.
For the investigation itself, use the Nextretro blameless retrospective guide. For recording the team's separate decision, see the retrospective action items guide.
Read next: Review an on-call rotation separately from an incident.
Frequently asked questions
Do both meetings need the same attendees?
Not necessarily. Invite people with relevant incident knowledge to the postmortem and keep the retrospective focused on the team that will change its working practices.