Halfway through the sprint, spend five minutes finding out whether the last retro's experiments have started, whether they will get a fair trial and who can help if they won't. Leave with an owner and a next move for each action that needs one. Save the fuller discussion about whether a change worked for the next retrospective.
Choose a day early enough to recover. For a ten-working-day sprint, day four or five is a useful starting point. If an experiment depends on an event, such as a scheduled handover, do the check before that event rather than at the midpoint by default. Use an existing meeting slot or a shared thread where the owners can see replies. You don't need to create a new ceremony.
Use five minutes to make decisions
- Minute 1: Read the commitments. Open the existing action records. Each owner marks their action on track, needs help, or hasn't had a chance to run. Don't rewrite the register for the check.
- Minutes 2 and 3: Discuss only exceptions. Ask what's needed before the next opportunity. For a change that has already run, attach early evidence and leave interpretation for later unless it points to a problem that needs immediate action.
- Minute 4: Assign the next move. Name the person who will make it and when. If their help isn't yet confirmed, record who will ask and by when. Check the time cost before adapting the experiment.
- Minute 5: Read back decisions. Confirm what's changing and post it next to each existing action. Take anything that needs a longer decision out of the five-minute slot.
For example, a team is trialling a 15-minute overlap for equipment handovers. By Wednesday there have been no eligible handovers, but one is due on Friday. It turns out the incoming engineer can't make the originally proposed time. The owner asks both engineers to confirm a time by Thursday lunchtime. The team records “not yet tried: no eligible handovers” rather than calling the idea a failure. If Friday slips, they take the lack of evidence into the next retro instead of inventing a result.
Copy this check into a team thread
Mid-sprint check, reply by [day and time] on the existing action:
- Has the experiment run? If not, when is the next real chance?
- What's at risk before the next retro?
- What help or decision do you need, from whom and by when?
Facilitator closes the thread with: [action] | [next move] | [owner] | [when].
If the same check keeps finding that trials start too late, bring the pattern to sprint planning. Decide when each trial needs to begin and what work it will replace. The check should uncover timing problems, not become the only reason people remember the actions.
Silence isn't an “on track” update. Follow up directly with the owner if the next opportunity is approaching. If an action is already running and needs no help, leave it alone. If there were no actions, skip the check. The Nextretro guide to action items covers the separate next-retro review: what was tried, what changed and whether to keep, adapt or stop it.
Read next: Decide which unfinished actions should carry over.
Frequently asked questions
Where should we record the check if we run it in chat?
Put the result next to the original action, or link one canonical record from the thread. Avoid making the next facilitator reconstruct events from separate messages.
